Pre-manufacturing components (non-systemised primary structure)
Modern Methods of Construction, Introducing the MMC definition framework, published by Ministry of Housing, Communities & Local Government (MHCLG) in 2019 defines 7 categories for MMC:
- Category 1 – Pre-manufacturing (3D primary structural systems).
- Category 2 – Pre-manufacturing (2D primary structural systems).
- Category 3 – Pre-manufacturing components (non-systemised primary structure).
- Category 4 – Additive manufacturing (structural and non-structural)
- Category 5 – Pre-manufacturing (non structural assemblies and sub-assemblies).
- Category 6 – Traditional building product led site labour reduction / productivity improvements.
- Category 7 – Site process led site labour reduction / productivity / assurance improvements.
Category 3 – Pre-manufacturing components (non-systemised primary structure) is defined as:
‘Use of pre-manufactured structural members made of framed or mass engineered timber, cold rolled or hot rolled steel or pre-cast concrete. Members to include load bearing beams, columns, walls, core structures and slabs that are not substantially in-situ workface constructed and are not part of a systemised design.
‘This category although focussed on superstructure elements, would also include sub-structure elements such as pre-fabricated ring beams, pile caps, driven piles and screw piles.’
[edit] Related articles on Designing Buildings
- British post-war mass housing.
- Design for deconstruction.
- Design for Manufacture and Assembly (DfMA).
- MMC definition framework.
- Modern methods of construction.
- Off site, on track.
- Off-site construction.
- Off-site prefabrication of buildings: A guide to connection choices.
- Prefabrication.
- Pre-manufactured value.
- Primary structure.
- Volumetric.
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.